Art. 12 Regulation (EU) 2024/2027

Strategic analysis

In forcesince 26 Jul 2024
1.

At the beginning of the verification, the verifier shall assess the likely nature, scale and complexity of the verification tasks by carrying out a strategic analysis of all activities relevant to the ship.

2.

For the purposes of understanding the activities carried out by the company, the verifier shall collect and review the information needed to assess that the verification team is sufficiently competent to: (i) carry out the verification; (ii) determine that the time allocation indicated in the contract has been set correctly; and (iii) ensure that it is able to conduct the necessary risk assessment. The information shall include at least:

(a)

the information referred to in Article 11(1) and (2);

(b)

the information obtained from the verification in previous years if the verifier is carrying out the verification for the same company.

3.

When reviewing the information referred to in paragraph 2, the verifier shall at least assess the following aspects:

(a)

the ship’s engines and fuel types used as well as the number of voyages carried out by the ship in question during the reporting period;

(b)

the monitoring plan as assessed by the verifier;

(c)

the data-flow activities and the control system.

4.

When carrying out the strategic analysis, the verifier shall verify the following:

(a)

whether the monitoring plan presented to it is the most recent version;

(b)

whether there have been any modifications to the monitoring plan during the reporting period as referred to in Article 9(2) of Regulation (EU) 2023/1805.