70 5. ASSESSMENT OF THE DEROGATION REQUEST CONCERNING THE CANARY ISLANDS › 5.2. Scope of the derogation › 5.2.4. Chapter III of Regulation (EU) 2019/943: Network access and congestion/management – Articles 14 to 17 and Article 19 › 5.2.4.1. The Application, Decision_act (EU) 2024/560

In forcesince 8 Dec 2023

Spain explains that the requirements set out in Articles 14 to 16 and Article 19 cannot be applied in the NPTs, because the TSO carries out the generation dispatch for each of the isolated electricity systems and those systems do not constitute separate interconnected bidding zones. Those dispatches take into consideration the energy transferred via links between islands in the Canary Islands system (i.e., between Lanzarote and Fuerteventura). In the event of congestion in those links, the TSO reorganises the dispatch of the available generating capacity, taking into account mainly technical criteria, to ensure supply. Spain also explains that since the NPT do not constitute separate bidding zones, there is not an associated cross-zonal capacity market and thus no congestion income is generated.