Respondents to the public consultation were against granting such derogation, as it would legitimise a project according to which Red Eléctrica de España S.A.U. (‘REE’), the Spanish TSO, has been allowed to develop the Chira-Soria Project in the Canary Islands without tendering procedure (‘the Chira-Soria Project‘) [The Chira-Soria Project concerns the construction of an energy storage facility (pumped storage hydroelectric power plant) of 200 MW installed capacity and 3,5 GWh energy storage capacity in the island of Gran Canaria. For more information about the project see: Central hidroeléctrica de bombeo reversible Salto de Chira | Red Eléctrica (ree.es).], as required by Article 54 of Directive (EU) 2019/944. Respondents noted that the fact that the derogation also covers the other NPT is not relevant because the orography of the Balearic Islands and the small size of Ceuta and Melilla would not allow for pumped hydropower storage in those territories [Pumped hydropower storage would qualify as a storage facility pursuant to Directive (EU) 2019/944.].
30 4. COMMENTS RECEIVED DURING THE CONSULTATION PERIOD, Decision_act (EU) 2024/560
In forcesince 8 Dec 2023