Moreover, due to the current conditions of the electricity market in the Canary Islands (see section 2), it appears that commercial investments in pumped hydropower storage facilities cannot be promptly facilitated, despite the urgent necessity for facilities which provide low carbon flexibility. This is because hydropower projects have longer pre-development, construction and operational timelines than other technologies with investment risks being higher, which may require specific policy instruments and incentives as well as longer-term policy perspective and vision. The urgency of such projects, in view of the planned uptake of renewable energy generation in the near future [See for example the measures described in the Draft Update of the Integrated National Energy and Climate Plan (2023-2030) submitted by Spain concerning the Canary Islands, aiming to achieve the decarbonisation by 2040 (page 144): https://commission.europa.eu/publications/spain-draft-updated-necp-2021-2030_en. See also Ley 6/2022, de 27 de diciembre, de cambio climático y transición energética de Canarias.] and of the system operation challenges which the Canary Islands appear to be facing [Antonio Morales exige al Ministerio acciones urgentes para acabar con la inseguridad y el riesgo de apagón general en Gran Canaria - Cabildo de Gran Canaria - Portales Web Cabildo GC.] is of such importance that the Commission considers that in the case of this outermost region, Spain should not be required to comply with the conditions set out in Article 54(2) of Directive (EU) 2019/944.
58 5. ASSESSMENT OF THE DEROGATION REQUEST CONCERNING THE CANARY ISLANDS › 5.2. Scope of the derogation › 5.2.1. Articles 54 and 66 of Directive (EU) 2019/944 › 5.2.1.2. Assessment, Decision_act (EU) 2024/560
In forcesince 8 Dec 2023