On the basis of the findings set out in recitals 6 to 49, the Commission concludes that the corrective measures set out in the draft final performance plan result in a reduction of the determined costs for the Belgium-Luxembourg charging zone. This leads to the revised cost-efficiency performance targets which should be considered consistent with the Union-wide performance targets for RP3.
50 COMMISSION ASSESSMENT › Conclusion on the assessment of the corrective measures designed to achieve consistency of the revised cost-efficiency performance targets with the Union-wide cost-efficiency performance targets, Decision_act (EU) 2024/350
In force