41 COMMISSION ASSESSMENT › Assessment of the revised performance targets › Assessment of the capacity-related measures invoked by Luxembourg to justify the observed deviations from the Union-wide cost-efficiency trends › Assessment of modified Measure 2, Decision_act (EU) 2024/343

In forcesince 13 Dec 2023

In Implementing Decision (EU) 2023/1336, the Commission observed that Measure 2 included two elements, namely the mid-life upgrade of the current ATM system of skeyes and the replacement, in the longer term, of that current ATM system by a single, integrated and harmonised airspace management system to be developed together with MUAC and the Belgian Defence as part of the ‘Shared Air Traffic Services System 3’ project (‘SAS 3 project’). The Commission however noted, in light of credible information available at that time, that there were serious doubts about the actual implementation of the SAS 3 project. Furthermore, the Commission excluded certain costs presented under Measure 2 from the additional costs considered to be necessary and proportionate with regard to the achievement of capacity targets and thus justifying a deviation from Union-wide cost-efficiency performance targets.