145 4. INJURY › 4.4. Economic situation of the Union industry › 4.4.3. Microeconomic indicators › 4.4.3.1. Prices and factors affecting prices, Regulation (EU) 2023/99

In forcesince 11 Jan 2023

The list of tenders from the non-cooperating user showed that most of these tenders were granted to only one supplier. However, the weighted average volume quoted was rather low, around 50000 items per tender for the complete lifetime of a project, which explained that only one supplier was awarded the tenders in question. Nevertheless, the Commission observed that one project was allocated to two suppliers ‘due to high volume’ as mentioned during a hearing held with ACEA. Third, the information on tenders provided by the cooperating users concerned three tenders. For User B the data showed that it split a tender for a quantity above 1 million to two suppliers. Moreover, for User A the data provided by ACEA was contradictory. Indeed, on the one hand, it showed that there was one tender which was allocated to one supplier, and, on the other hand, in a separate table regarding offers, the same quantities of that tender were split between two tenders. Consequently, the Commission considered that the information provided by ACEA did not contradict the findings made in recital 157, that the tenders may be allocated to several suppliers based on the quantity quoted which puts into question the actual amount of volumes to be supplied by each supplier throughout the life of the project. In addition, as explained in recital 115 above, ACEA acknowledged the fact that the total volume to be supplied may also depend on the success of the particular car model to be produced.