Recycled plastic materials and articles obtained by means of a recycling process based on a suitable recycling technology for which this Regulation requires the individual authorisation of recycling processes and for which a valid application has been submitted to the competent authority in accordance with Article 5 of Regulation (EC) No 282/2008, or for which an application is submitted in accordance with Articles 17(1) or 22(1) of this Regulation at the latest on 10 July 2023 may be placed on the market until the applicant withdraws its application, or until the Commission adopts a decision granting or refusing authorisation of the recycling process pursuant to Article 19(1).
Applications submitted in accordance with Regulation (EC) No 282/2008 for the authorisation of recycling processes based on a recycling technology that is not included as a suitable recycling technology in Annex I at the time of entry into force of this Regulation and for product loops which are in a closed and controlled chain shall be deemed terminated.
Recycled plastic materials and articles obtained by means of recycling processes based on a recycling technology that is not considered suitable by this Regulation may continue to be placed on the market only until 10 July 2023, unless manufactured with a recycling installation that is operated for the purpose of development of a novel technology in accordance with Chapter IV.
For the purposes of this Regulation, the start date of a decontamination installation that was used to produce recycled plastic before 10 October 2022 shall be 10 December 2022 for a decontamination installation which is based on a suitable recycling technology, or 10 June 2023 for a decontamination installation that is operated for the purpose of development of a novel technology in accordance with Chapter IV.
By derogation to the time limit specified in Article 10(2), developers of technologies already in use to manufacture recycled plastic materials and articles before 10 October 2022 shall provide the information required in accordance with Article 10(3) and publish the report required in accordance with Article 10(4) before 10 April 2023. The time limit of 5 months referred to in the first subparagraph of Article 10(8) shall apply from the date on which the competent authority receives the information in accordance with Article 10(3). The possibility for a competent authority to delay the start of the operation of the first decontamination installation set out in the second sub-paragraph of Article 10(8) shall not apply.
Food business operators may use recycled plastic materials and articles legally placed on the market to pack food and place that on the market until exhaustion of stocks.