Art. 32 Regulation (EU) 2022/1616

Specific transitional provisions applicable to the manufacture of materials and articles in which the recycled plastic is used behind a functional barrier

In forcesince 15 Sep 2022
1.

The following additional requirements shall apply to the operation of recycling installations that already manufactured recycled plastic materials and articles in which the recycled plastic is used behind a plastic functional barrier before 10 October 2022:

(i)

the decontamination installation manufacturing the recycled plastic as well as any post-processing installation adding the functional barrier is included in a list of installations submitted by a developer notifying the specific recycling technology applied by all the installations on the list in accordance with Article 10(2); and,

(ii)

results from migration tests, challenge tests, and/or migration modelling, as appropriate and applicable to the notified recycling technology and to the specifics of the process that the recycling installation applies, unequivocally show that the functional barrier is capable, taking into account the contamination level of the recycled plastic, of acting as a functional barrier in accordance with Regulation (EU) No 10/2011 during the foreseeable shelf-life of the manufactured recycled plastic materials and articles, which comprises the time from their manufacture onwards, and the maximum shelf-life of the packaged food, if any.

The developer shall communicate the list referred to in point (i) and a study report incorporating the test results required under point (ii) to the competent authority and to the Commission before 10 April 2023. A robust summary of the study shall be part of the initial report published in accordance with Article 10(4).

2.

Individual recyclers, converters or other operators participating in the manufacture of the materials referred to in paragraph 1 shall not act as developer in accordance with point (i) thereof. In case the developer of a specific technology is the individual recycler, converter or other operator using the installation or part thereof, or may not be identified, does no longer exist or is not willing to assume the obligations laid down in this Regulation, at least one of the operators using the installation shall join a consortium or association that can act as developer on its behalf, or ask an independent third party to act as developer. Where a consortium, association or third party receives multiple requests from such operators, it shall group these requests on the basis of the technical equivalence of the applied recycling installations and processes with the purpose to minimise the number of technologies it notifies.

3.

By derogation to Article 13(1), recyclers operating decontamination installations notified by the same developer may agree to monitor the contamination levels in only a third of the installations included in the list provided in accordance with point (i) of paragraph 1, provided that the installations where the monitoring is carried out are designated on that list, monitoring is carried out at all recycling facilities, and the robustness of the overall sampling strategy is not reduced.