Finally, after provisional disclosure, Chromeni contested the Commission’s treatment of the claimed start-up cost adjustments, which concerned depreciation costs and selling, general and administrative expenses. The Commission had limited the period to which an adjustment for depreciation costs could be made to 3 months and rejected the start-up adjustment of SGA expenses. Chromeni submitted that the start-up phase of a steel production line is much longer than 3 months, thereby pointing at the date of issuance of the final acceptance certificate. However, the Commission had established that commercial production had already started well before that date. Moreover, in line with Article 2(5) of the basic Regulation where it is, inter alia, stipulated that the length of a start-up phase shall not exceed an appropriate initial portion of the period for cost recovery, it is the Commission’s consistent case practice to limit the duration of a start-up phase to 3 months. Having regard to the circumstances of the present case, the Commission therefore determined that 3 months was an appropriate time period. With regard to the selling, general and administrative expenses, Chromeni provided no evidence that these costs are linked to production and they are therefore not affected by the use of new production facilities requiring substantial additional investment and by low-capacity utilisation rates, which are the result of start-up operations, as required by Article 2(5) fourth paragraph of the basic Regulation.
43 3. DUMPING › 3.1. India › 3.1.2. Normal value, Regulation (EU) 2021/2012
In forcesince 17 Nov 2021