As explained in recital (61) above, the 2019 report dates from after the establishment of the Dingheng production site. The Dingsheng Group, however, claimed that the 2019 report was ‘nothing else than an integration and a revision of the First Plan which was prepared in 2018 and which could not be implemented by the Dingsheng Group’. In addition, the Dingsheng Group claimed that the 2019 report suggested to downsize the initial project, envisaging a production capacity of [40000 – 60000] tonnes per year instead of [50000 – 70000] tonnes per year. However, the Commission considered this claim to be factually incorrect given that the 2019 report explicitly mentions in several instances that the purpose of the report is to enable an additional production capacity of [40000 – 60000] tonnes to reach an annual output of [90000 – 130000] tonnes. In fact, the title of the report is ‘Add [40000 – 60000] tons of aluminum foil production capacity project’.
65 2. RESULTS OF THE INVESTIGATION › 2.4. Nature of circumvention practices for which there was insufficient due cause or economic justification, Regulation (EU) 2021/1474
In force