Art. 45 Regulation (EU) 2017/1485

Structural data exchange

In forcesince 2 Aug 2017
1.

Each SGU which is a power generating facility owner of a type D power generating module connected to the transmission system shall provide the TSO with at least the following data:

(a)

general data of the power generating module, including installed capacity and primary energy source;

(b)

turbine and power generating facility data including time for cold and warm start;

(c)

data for short-circuit current calculation;

(d)

power generating facility transformer data;

(e)

FCR data of power generating modules offering or providing that service, in accordance with Article 154;

(f)

FRR data of power generating modules offering or providing that service, in accordance with Article 158;

(g)

RR data of power generating modules that offer or provide that service in accordance with Article 161;

(h)

data necessary for restoration of the transmission system;

(i)

data and models necessary for performing dynamic simulation;

(j)

protection data;

(k)

data necessary for determining the costs of remedial actions in accordance with Article 78(1)(b); where a TSO makes use of market based mechanisms in line with Article 4(2)(d), the provision of prices to be paid by the TSO shall be considered sufficient;

(l)

voltage and reactive power control capability.

2.

Each SGU which is a power generating facility owner of a type B or a type C power generating module connected to the transmission system shall provide the TSO with at least the following data:

(a)

general data of the power generating module, including installed capacity and primary energy source;

(b)

data for short-circuit current calculation;

(c)

FCR data according to the definition and requirements of the Article 173 for power generating modules offering or providing that service;

(d)

FRR data for power generating modules that offer or provide that service;

(e)

RR data for power generating modules that offer or provide that service;

(f)

protection data;

(g)

reactive power control capability;

(h)

data necessary for determining the costs of remedial actions in accordance with Article 78(1)(b); where a TSO makes use of market based mechanisms in line with Article 4(2)(d), the provision of prices to be paid by the TSO shall be considered sufficient;

(i)

data necessary for performing dynamic stability assessment according to Article 38.

3.

A TSO may request the power generating facility owner of a power generating module connected to the transmission system to provide further data where appropriate for operational security analysis in accordance with Title 2 of Part III.

4.

Each HVDC system owner or interconnector owner shall provide the TSO with the following data regarding the HVDC system or interconnector:

(a)

nameplate data of the installation;

(b)

transformers data;

(c)

data on filters and filter banks;

(d)

reactive power compensation data;

(e)

active power control capability;

(f)

reactive power and voltage control capability;

(g)

active or reactive operational mode prioritization, if existing;

(h)

frequency response capability;

(i)

dynamic models for dynamic simulation;

(j)

protection data; and

(k)

fault-ride-through capability.

5.

Each AC interconnector owner shall provide the TSO with at least the following data:

(a)

nameplate data of the installation;

(b)

electrical parameters;

(c)

associated protections.