Art. 158 Regulation (EU) 2017/1485

FRR minimum technical requirements

In forcesince 2 Aug 2017cited 4×
1.

The FRR minimum technical requirements shall be the following:

(a)

each FRR providing unit and each FRR providing group shall be connected to only one reserve connecting TSO;

(b)

a FRR providing unit or FRR providing group shall activate FRR in accordance with the setpoint received from the reserve instructing TSO;

(c)

the reserve instructing TSO shall be the reserve connecting TSO or a TSO designated by the reserve connecting TSO in an FRR exchange agreement pursuant to Article 165(3) or 171(4);

(d)

a FRR providing unit or FRR providing group for automatic FRR shall have an automatic FRR activation delay not exceeding 30 seconds;

(e)

a FRR provider shall ensure that the FRR activation of the FRR providing units within a reserve providing group can be monitored. For that purpose, the FRR provider shall be capable of supplying to the reserve connecting TSO and the reserve instructing TSO real-time measurements of the connection point or another point of interaction agreed with the reserve connecting TSO concerning:

(i)

time-stamped scheduled active power output;

(ii)

time-stamped instantaneous active power for:

each FRR providing unit,

each FRR providing group, and

each power generating module or demand unit of a FRR providing group with a maximum active power output larger than or equal to 1,5 MW;

(f)

a FRR providing unit or FRR providing group for automatic FRR shall be capable of activating its complete automatic reserve capacity on FRR within the automatic FRR full activation time;

(g)

a FRR providing unit or FRR providing group for manual FRR shall be capable of activating its complete manual reserve capacity on FRR within the manual FRR full activation time;

(h)

a FRR provider shall fulfil the FRR availability requirements; and

(i)

a FRR providing unit or FRR providing group shall fulfil the ramping rate requirements of the LFC block.

2.

All TSOs of a LFC block shall specify FRR availability requirements and requirements on the control quality of FRR providing units and FRR providing groups for their LFC block in the LFC block operational agreement pursuant to Article 119.

3.

The reserve connecting TSO shall adopt the technical requirements for the connection of FRR providing units and FRR providing groups to ensure the safe and secure delivery of FRR.

4.

Each FRR provider shall:

(a)

ensure that its FRR providing units and FRR providing groups fulfil the FRR technical minimum requirements, the FRR availability requirements and the ramping rate requirements in paragraphs 1 to 3; and

(b)

inform its reserve instructing TSO about a reduction of the actual availability of its FRR providing unit or its FRR providing group or a part of its FRR providing group as soon as possible.

5.

Each reserve instructing TSO shall ensure the monitoring of the compliance with the FRR minimum technical requirements in paragraph 1, the FRR availability requirements in paragraph 2, the ramping rate requirements in paragraph 1 and the connection requirements in paragraph 3 by its FRR providing units and FRR providing groups.

  • Regulation (EU) 2017/21951824Law

    … 1 og 8, artikel 158, stk. 1, litra e), og artikel 158, stk. 4, litra b), samt artikel 161, stk. 1), litra f), og artikel 161, stk. 4, litra b), i forordning (EU) 2017/1485 g) fastlæggelse af en placering for hvert enkelt standardprodukt …

  • Netcode elektriciteit3.24Law

    … artikel 15, tweede lid, onderdeel e van de Verordening (EU) 2016/631 (NC RfG), die voldoen aan de specificaties van de artikelen 158 en 159 van de Verordening (EU) 2017/1485 (GL SO). 7. De elektriciteitsproductie-eenheid is in staat …

  • Systeemcode elektriciteit 20263.22Law

    … in artikel 15, tweede lid, onderdeel e van Verordening (EU) 2016/631 (NC RfG), die voldoen aan de specificaties van de artikelen 158 en 159 van Verordening (EU) 2017/1485 (GL SO). 7. De elektriciteitsproductie-eenheid is in staat …

  • Commission Regulation (EU) 2017/2195 of 23 November 2017 establishing a guideline on ele…18Law

    … reserve connecting DSO to evaluate the provisions of balancing services pursuant to Article 154(1), Article 154(8), Article 158(1)(e), Article 158(4)(b), Article 161(1)(f) and Article 161(4)(b) of Regulation (EU) 2017/1485; (g) the …