Art. 36 Directive (EU) 2012/34

Reservation charges

In forcesince 21 Nov 2012cited 8×

Infrastructure managers may levy an appropriate charge for capacity that is allocated but not used. That non-usage charge shall provide incentives for efficient use of capacity. The levy of such a charge on applicants that were allocated a train path shall be mandatory in the event of their regular failure to use allocated paths or part of them. For the imposition of this charge, the infrastructure managers shall publish in their network statement the criteria to determine such failure to use. The regulatory body referred to in Article 55 shall control such criteria in accordance with Article 56. Payments for this charge shall be made by either the applicant or the railway undertaking appointed in accordance with Article 41(1). The infrastructure manager shall always be able to inform any interested party of the infrastructure capacity which has already been allocated to user railway undertakings.

  • Judgment of the Court (Fifth Chamber) of 9 September 2021. AS „LatRailNet” and „Latvijas dzelzceļš” VAS v Valsts dzelzceļa administrācija.Decision

    Section 2 of Chapter IV of Directive 2012/34, entitled ‘Infrastructure and services charges’, consists of Articles 29 to 37 of that directive.

    9 Sep 2021 · 62020CJ0144

  • Spoorwegwet5862Law

    … de criteria voor het vaststellen van de nalatigheid van gebruik van toegewezen capaciteit, bedoeld in artikel 36, van richtlijn 2012/34/EU. 3. Met inachtneming van artikel 27, eerste en vierde lid, van richtlijn 2012/34/EU stelt de …

  • Regulation (EU) 2020/14292Law

    … Независимо от член 27 и третото изречение от член 36 от Директива 2012/34/ЕС и при спазване на правилата за държавната помощ държавите …

  • BVerwG, Urteil vom 12. Oktober 2022 - 6 C 10/20Decision

    … Art. 36 der Richtlinie 2012/34/EU, dessen Umsetzung § 40 Abs. 1 ERegG dient, sieht in seinem Satz 1 vor, dass die Infrastrukturbetreiber ein angemessenes Entgelt für Fahrwegkapazität erheben können, die zugewiesen, aber nicht in …

    12 Oct 2022 · WBRE202300058

  • Judgment of the Court (Second Chamber) of 22 May 2025. ÖBB-Infrastruktur AG and WESTbahn Management GmbH v Schienen-Control Kommission.Decision

    According to point 2 of that annex, the network statement is to include a section on charging principles and tariffs which is to contain appropriate details of the charging scheme as well as sufficient information on charges. In that …

    22 May 2025 · 62023CJ0538

  • Judgment of the Court (First Chamber) of 28 September 2023. UAB „Gargždų geležinkelis“ v Lietuvos transporto saugos administracija and OtherDecision

    Section 2 of Chapter IV of Directive 2012/34, entitled ‘Infrastructure and services charges’, contains, inter alia, Articles 31, 32 and 36 of that directive.

    28 Sep 2023 · 62021CJ0671

  • Regulation (EU) 2026/118479Lawamends

    … Article 3, points (20), (22), (23), (27) and (28), Articles 7b, 36 and 38 to 54 of Directive 2012/34/EU and Annex IV, point (3), and Annex VII thereto shall not apply to activities and tasks carried out in relation to the working …

  • Arrêt de la Cour (septième chambre) du 13 novembre 2025. Commission européenne contre Royaume d'Espagne.Decision

    Par son troisième grief, la Commission reproche au Royaume d’Espagne de ne pas avoir rendu applicable la loi 26/2022 qui remédierait aux défauts de transposition de la directive 2012/34 résultant des articles 96 à 98 de la loi …

    13 Nov 2025 · 62024CJ0250