Art. 32 Directive (EU) 2012/34

Exceptions to charging principles

In forcesince 24 Dec 2016cited 26×
1.

In order to obtain full recovery of the costs incurred by the infrastructure manager a Member State may, if the market can bear this, levy mark-ups on the basis of efficient, transparent and non-discriminatory principles, while guaranteeing optimal competitiveness of rail market segments. The charging system shall respect the productivity increases achieved by railway undertakings.

The level of charges shall not, however, exclude the use of infrastructure by market segments which can pay at least the cost that is directly incurred as a result of operating the railway service, plus a rate of return which the market can bear.

Before approving the levy of such mark-ups, Member States shall ensure that the infrastructure managers evaluate their relevance for specific market segments, considering at least the pairs listed in point 1 of Annex VI and retaining the relevant ones. The list of market segments defined by infrastructure managers shall contain at least the three following segments: freight services, passenger services within the framework of a public service contract and other passenger services.

Infrastructure managers may further distinguish market segments according to commodity or passengers transported.

Market segments in which railway undertakings are not currently operating but may provide services during the period of validity of the charging system shall also be defined. The infrastructure manager shall not include a mark-up in the charging system for those market segments.

The list of market segments shall be published in the network statement and shall be reviewed at least every five years. The regulatory body referred to in Article 55 shall control that list in accordance with Article 56.

2.

For the carriage of goods from and to third countries operated on a network whose track gauge is different from the main rail network within the Union, infrastructure managers may set higher charges in order to obtain full costs recovery of the costs incurred.

3.

For specific future investment projects, or specific investment projects that have been completed after 1988, the infrastructure manager may set or continue to set higher charges on the basis of the long-term costs of such projects if they increase efficiency or cost-effectiveness or both and could not otherwise be or have been undertaken. Such a charging arrangement may also incorporate agreements on the sharing of the risk associated with new investments.

4.

The infrastructure charges for the use of railway corridors which are specified in Commission Regulation (EU) 2016/919 [Commission Regulation (EU) 2016/919 of 27 May 2016 on the technical specification for interoperability relating to the ‘control-command and signalling’ subsystems of the rail system in the European Union (OJ L 158, 15.6.2016, p. 1).] may be differentiated to give incentives to equip trains with the ETCS that is compliant with the version adopted by the Commission Decision 2008/386/EC [Commission Decision 2008/386/EC of 23 April 2008 modifying Annex A to Decision 2006/679/EC concerning the technical specification for interoperability relating to the control-command and signalling subsystem of the trans-European conventional rail system and Annex A to Decision 2006/860/EC concerning the technical specification for interoperability relating to the control-command and signalling subsystem of the trans-European high-speed rail system (OJ L 136, 24.5.2008, p. 11).] and with successive versions. Such differentiation shall not result in any overall increase in revenue for the infrastructure manager.

Member States may decide that this differentiation of infrastructure charges does not apply to railway lines specified in Regulation (EU) 2016/919 on which only ETCS equipped trains run.

Member States may decide to extend this differentiation to railway lines not specified in Regulation (EU) 2016/919.

5.

To prevent discrimination, Member States shall ensure that any given infrastructure manager's average and marginal charges for equivalent use of its infrastructure are comparable and that comparable services in the same market segment are subject to the same charges. The infrastructure manager shall show in the network statement that the charging system meets these requirements in so far as this can be done without disclosing confidential business information.

6.

If an infrastructure manager intends to modify the essential elements of the charging system referred to in paragraph 1 of this Article, it shall make them public at least three months in advance of the deadline for the publication of the network statement according to Article 27(4).

The 10 that are cited most themselves, of 26.

  • Regulation (EU) 2015/9094Law

    … за разграничаване на таксите, посочено в член 31, параграф 5 и член 32, параграф 4 от Директива 2012/34/ЕС; н) амортизацията, която не е …

  • Directive (EU) 2016/2370Lawamends

  • Judgment of the Court (Fifth Chamber) of 9 September 2021. AS „LatRailNet” and „Latvijas dzelzceļš” VAS v Valsts dzelzceļa administrācija.Decisioninterprets

    This request for a preliminary ruling concerns the interpretation of Article 32(1) and Article 56(2) of Directive 2012/34/EU of the European Parliament and of the Council of 21 November 2012 establishing a single European railway area (OJ …

    9 Sep 2021 · 62020CJ0144

  • Conseil d'État, 2ème et 7ème chambres réunies, 5 mars 2024, n° 472859, mentionné aux tables du recueil LebonDecision

    … à la Cour de justice de l'Union européenne quatre questions préjudicielles portant sur l'interprétation de l'article 32, paragraphe 1 de la directive 2012/34/UE du Parlement européen et du Conseil du 21 novembre 2012 établissant un …

    5 Mar 2024 · DCE_472859_20240305

  • Opinion of Advocate General Campos Sánchez-Bordona delivered on 25 March 2021. AS „LatRailNet” and „Latvijas dzelzceļš” VAS v Valsts dzelzceDecision

    The dispute concerns the mark-ups on charges for use of railway infrastructure which are levied in the rail passenger transport segment. Directive 2012/34/EU [Directive of the European Parliament and of the Council of 21 November 2012 …

    25 Mar 2021 · 62020CC0144

  • BGH, Urteil vom 21. September 2021 - KZR 88/20Decision

    … Rn. 28; vgl. Art. 32 Richtlinie 2012/34/EU des Europäischen Parlaments und des Rates vom 21. November 2012 zur Schaffung eines einheitlichen europäischen Eisenbahnraums).

    21 Sep 2021 · KORE302792021

  • Opinion of Advocate General Campos Sánchez-Bordona delivered on 16 March 2023. UAB „Gargždų geležinkelis“ v Lietuvos transporto saugos adminDecision

    In Directive 2012/34, the specific features of the nature of the goods are taken into account for setting mark-ups, but not in the coordination process. Under the fourth subparagraph of Article 32(1) thereof, infrastructure managers may …

    16 Mar 2023 · 62021CC0671

  • Judgment of the Court (Second Chamber) of 22 May 2025. ÖBB-Infrastruktur AG and WESTbahn Management GmbH v Schienen-Control Kommission.Decisioninterprets

    On those grounds, the Court (Second Chamber) hereby rules: 1. Article 29(1) and Articles 32 and 56 of Directive 2012/34/EU of the European Parliament and of the Council of 21 November 2012 establishing a single European railway area, as …

    22 May 2025 · 62023CJ0538

  • Opinion of Advocate General Ćapeta delivered on 7 November 2024. ÖBB-Infrastruktur AG and WESTbahn Management GmbH v Schienen-Control KommisDecision

    As explained above in respect of charging principles, charges may cover the range between direct costs [These include the charges for the minimum access package and track access to service facilities, which must be set at the cost that is …

    7 Nov 2024 · 62023CC0538

  • VwGH 05.10.2021, Ro 2020/03/0042Decision

    5 Oct 2021 · JWT_2020030042_20211005J00