A | B | C | D | E | F | G | H
Number | Plant name |
Plant location
(address)
Date on which the application for the first permit for the plant has been submitted and date on which the plant has been put into operation for the first time |
OR
Date on which the first permit for the plant has been granted
Any extension by at least 50 MW of the total rated thermal input of the combustion plant, which took place between 27 November 2002 and 31 December 2010
(total extension in MW)
Total rated thermal input on 31.12.2010
(MW)
Annual number of operating hours
(average 2001-2010)
Pollutant(s) (SO2, NOx, dust) for which the plant concerned is NOT covered by the transitional national plan
A | I | J | K | L | M
Number | Indicate if the plant is a gas turbine or gas engine |
Annual amount of fuel used
(average 2001-2010)
Average annual waste gas flow rate
(average 2001-2010)
Annual quantity of S in indigenous solid fuels used which was introduced into the combustion plant
(average 2001-2010)
Conversion factor(s) used in case the waste gas flow rate was calculated from the fuel input (per fuel type)
(TJ/year) | (Nm3/y) | (tpa) | (Nm3/GJ)
hard coal | lignite | biomass | other solid fuels | liquid fuels | gaseous fuels | | |