The Polish request considers that the relevant geographical market is limited to the national territory. The market presents a unified character with no obstacles for electricity generated in one region of the country to be purchased by a recipient from a different region (the majority of electrical energy capacity is installed in the south of Poland, but energy from this region is sold throughout Poland). Furthermore, according to the 2007 Activity Report [English Language version of the 2007 Activity Report, issued by the President of the Energy Regulatory Office in Poland, dated 31 October 2007 and published 24.4.2008 on http://www.ure.gov.pl/portal/en/1/17/Activity_Report_2007.html], in ‘2006 system congestion of structural character … was existent at the borders with Germany, the Czech Republic and Slovakia. …’ In 2006 9,74 % of the total generation of electricity was exported from Poland, whereas imports to Poland in the same year amounted to 2,94 % of total generation (net exports thus accounted for 6,8 % of total generation in 2006). The 2007 Activity Report concludes that the ‘most important issue related to electricity exchange is limited transfer capacity of the Polish grid resulting in congestion on interconnectors. It is mainly caused by a high market pressure resulting from significant price differences of electricity in Poland and Germany, the Czech Republic and Sweden.’ Consequently, the territory of the Republic of Poland should be considered to constitute the relevant market for the purposes of evaluating the conditions laid down in Article 30(1) of Directive 2004/17/EC.
9 III. ASSESSMENT, Decision_act (EU) 2008/741
In force
- celex=32004L0017