II. DETAILED DESCRIPTION OF THE MEASURE › The original measure and its first extension › Structure of the Terni tariff, Decision_act (EU) 2008/408

In forcesince 20 Nov 2007
(22)

The preferential price was calculated by comparing two alternative methods and applying whichever was more favourable to the company:

(a)

Alternative 1 was based on the average electricity price paid by Società Terni’s manufacturing branches to the company’s electricity branch (corresponding to the production cost of Terni’s own hydroelectric plant);

(b)

Alternative 2 was linked to ENEL’s reference price for a customer having the same profile (self-producer) as Società Terni.