In force

The Commission considers the reductions in production costs as set out in points 16 to 18 to be significant. In order to assess the extent of these reductions, the Commission has taken account of the difference between average production cost calculated for the reference period (see recital 14) and the target cost for 2002, determined at GBP 1.15/GJ. While the cost reductions calculated for the central surface mines and north-east surface mines units ([...] % and [...] % respectively) are less than the very large reductions recorded by other production units, the absolute cost level of central surface mines and north-east surface mines during the reference period was already very close to the threshold of competitiveness with imported coal.