The technical risks associated with the project are as follows:
(a)
the operational reliability of a gas turbine is less than that of a conventional furnace;
(b)
a reliable control system must be developed for the gas turbine, the heat exchangers and the furnace.
In order to limit the risks associated with the new unit and ensure continuous heat supply, the old energy-inefficient unit is to be kept as a back-up system.