Moreover, there have been no problems of substance since the Commission started applying safeguards in the installation in 1986. At each annual inventory verification of materials held, only minimal differences between the physical inventory and the book inventory were determined. The operator consistently showed an attitude of attention and awareness of matters concerning the safeguards.

In assessing both the objective and the objective factors set out above the Commission considers that the infringement committed by Enusa is such that a sanction is warranted.

Given the circumstances, in particular that there are no special benefits to Enusa such as financial or technical assistance, the Commission is of the view that the appropriate sanction to impose is that laid down in Article 83 (1) (a) of the Treaty.

Finally, the warning of the Commission should set out the action to be taken by Enusa to preclude events of this nature in the future, all the more so since Enusa carries out such container transfer operations on a regular basis, and intends to continue doing so.

To this end Enusa shall provide the Commission within three months following this warning with a report on the actions it has undertaken in the following fields:

1.

the procedures of personnel training;

2.

the definition of access rights in the computer system used for nuclear materials accountancy;

3.

the internal provisions that influence how to make the proper distinction between empty and full containers;

4.

the procedures and practical tools used for physical verifications of incoming/outgoing material;

5.

the documentation and proper application of any modifications and improvements on points 1 to 4.

Moreover, the Commission's inspectors should be enabled to verify their implementation by one or more inspections of the situation of all five abovementioned points so that they may drawn up an assessment report,

HAS ADOPTED THIS DECISION: