, Special report No 4/94 on the urban environment together with the Commission's replies

In forcesince 8 Dec 1994

4.8. The Commission does not engage in the day-to-day monitoring of all participants in Recite networks. This is the responsibility of the chef de file, in this case, the lead city of the European Urban Observatory (EUO), Barcelona, which has established contacts with Genoa in order to clarify the exact status of their participation in this network.

5.

ACTIVITIES CONCERNING TRAINING,

RESEARCH, TRANSPORT, ENERGY

AND THE CULTURAL DOMAIN

5.2. The report states that it is principally the big automobile and electronics companies that participate in the DRIVE programme. However, out of 495 participants in DRIVE projects from large and small industries, administrations and research establishments, only 116, i.e. 23 %, are assured by large industries, for a total of ECU 41 million, i.e. 38 % of the funding of the programme.

It should also be noted that the programme addresses not only the effects of urban transport but also its causes. The possibilities for reducing road traffic and alternatives to the private car are also examined. In fact, urban traffic control, public transport and management of transport demand are components of urban projects that have been designed by the city authorities themselves and that integrate telematics solutions into their overall transport planning. Telematics for public transport and demand management comprise two out of the seven areas of the transport telematics programme.

Regarding coordination within the Commission, the programme contributes positively to the establishment of the Community policies on transport and environment. An example of current coordination is the Polis network of cities, which includes 40 cities and was set up with the active support of the Regional Fund. The cities involved in the Polis network have promoted the successful parts of the Thermie programme, thus contributing to the complementarity of the two programmes. These coordination efforts will be further increased in the 4th Framework Programme.

5.3. The Commission would stress that the authorizing Directorate-General is perfectly aware of the environmental policies drawn up by the Commission`s other departments. It should be emphasized that, in that Directorate-General, the competent department is engaged in a constant liaison process and, for example, maintains regular contacts so as to ensure that environmental policy is integrated into the development of technology in the energy field.