Measures to increase the water supply in the Autonomous Communities of Madrid, Andalusia, Castile-La Mancha and Navarre
Authority making the application
2.1. Name: Dirección General de Planificación
2.2. Address: Paseo de la Castellana, 162 - 28071 Madrid
Authority responsible for implementation
3.1. Name: Dirección General de Obras Hidráulicas
3.2. Address: Paseo de la Castellana, 67 - 28071 Madrid
Location
4.1. Member State: Spain
4.2. Region: Autonomous Communities of Andalusia, Castile-La Mancha, Madrid and Navarre
Brief description
The project consists of various measures to increase the water supply.
The measures include:
Castile-La Mancha and Madrid:
increasing the supply capacity of the district water utility of El Sorbe,
laying pipelines between the reservoirs of Torre de Abraham and Gasset. Water supply to Ciudad Real.
Andalusia:
connecting the Viñuela reservoir to the supply networks of the eastern coast of Malaga. Urgent work,
soundings of the aquifer at Sierra Blanca and construction of a radial well. Increasing the supply of drinking water to the western part of the Costa del Sol,
work needed to divert and exploit the water controlled by the J. Toran dam. Supply of Lora del Río.
Navarre:
water purification plant at Eguillor to supply the Pamplona region.
The specifications of the project will comply with Council Directive 80/778/EEC (1).
Principal objectives
To increase and improve the supply of drinking water to various highly-populated areas (some of which are currently supplied from wells).
Work schedule
Date of commencement: 1 January 1993
Date of completion: 31 May 1994
Socio-economic analysis
The socio-economic benefits cannot be directly quantified. However, the benefits of implementing this project are twofold:
the improvement of water resource management in the areas concerned,
increasing the water supply to users (1 000 000 people). Supplying water to communities not covered by the existing supply arrangements.
The scant rainfall during last spring and autumn has demonstrated the inadequacy of existing supply arrangements. This has caused a number of problems:
an increase in respiratory illnesses,
a substantial increase in allergies,
a deterioration in hygiene conditions,
a deterioration in the urban landscape,
a loss of many trees, bushes and expanses of grass,
fewer recreational possibilities for the community,
deterioration in the quality of life.
All of these problems can be solved with a sufficient supply of good-quality water through a project such as this one. The project will also prevent bottlenecks from forming in the industrial activity of the regions in question.
The following types of benefit have been quantified in the cost-benefit analysis:
greater availability of water,
increase in the welfare of the population through improved quality of life.
The cost-benefit analysis shows a positive internal rate of return.
Contribution to environmental policy
The project will help improve the quality of live of the population and contribute to the sustainable development of the area concerned in accordance with the guidelines of the fifth programme in relation to the environment and sustainable development.
Cost
"(ECU '000) "" ID="1">Total cost: > ID="2">30 899,343 "> ID="1">Expenditure prior to 1 January 1993: > ID="2">36,321 "> ID="1">Total eligible cost: > ID="2">30 863,022 "> ID="1">Total assistance applied for from the cohesion financial instrument: > ID="2">26 233,568 ">
Breakdown of the aid
"(ECU '000) "" ID="1">Increasing the supply capacity of the district water utility of El Sorbe > ID="2">3 351,339 "> ID="1">Laying pipelines between the reservoirs of Torre de Abraham and Gasset > ID="2">3 858,450 "> ID="1">Connecting the Viñuela reservoir to the supply networks of Malaga > ID="2">4 409,657 "> ID="1">Soundings of the aquifer at Sierra Blanca and radial well > ID="2">4 823,063 "> ID="1">Work needed to divert and exploit the water controlled by the J. Toran dam > ID="2">8 619,744 "> ID="1">Water purification plant at Eguillor > ID="2">1 171,315 ">
OJ No L 229, 30. 8. 1980, p. 11.