The decision to sell the majority of shares to Riva was taken after a general and unconditional bidding procedure which has been closed in October 1993. After an in-depth examination of the three bids received, the THA concluded that the Riva group had made the best offer. Germany submitted the comparison ofthe offers prepared by the THA and some additional information concerning the evaluation of the different proposals.

The restructuring concept envisages the modernization of the existing pig iron, crude steel, cold-rolling and re-treatment facilities without changing their current capacities and the installation of a new hot-wide-strip mill with a capacity of 900 kt/y tgo close the existing technological gap in the production flow which has been covered so far by expensive hire-rolling elsewhere. The existing installation for cutting hot wide coils into narrow strips will be closed.

The investments intended amount to DM 280 million for the pig iron facilities, DM 150 million for the crude steel facilities, DM 400 million for the hot-rolling facilities. Riva would cover DM 450 million of the total investment, the THA would cover DM 350 million and DM 300 million would be covered by investment aid under general regional aid schemes.

The THA would contribute DM 163 million to cover losses until privatization. To cover future losses until the completion of the restructuring, the THA accepted a negative purchase price of DM 180 million, which will be paid to Riva and immediately injected into the equity of the new private limited company, and a capital injection of DM 120 million. Riva would contribute DM 30 million to cover losses during the restructuring phase.

The plan envisages employment reductions of some 1 600 persons from 3 500 in 1993 to 1 900 in 1996, i.e. a reduction of 45,7 %. The total employment reduction since end of 1989 (11 510 workers) amounts to 9 610 workers, i.e. a reduction of 83,5 %.

In addition, Germany notified the Commission of the intention of the Riva group to close down of its hot-rolling facilities in the territory of the former GDR, a medium-section mill with a capacity of 320 kt/y belonging to HES Hennigsdorfer Elektrostahlwerke GmbH (Hennigsdorf/Brandenburg).