Moreover, it is to be noted that the operator, experiencing doubts about the adequacy of his accounting system, partly due to the Euratom safeguards inspectors' comments, decided to postpone a physical inventory taking to November 1991 in order to wash out the plant.

In carrying out this physical inventory taking, the operator himself detected the deficiencies of the accounting system through his investigations into the causes of the MUF. Upon detecting the MUF, the operator decided to take the following immediate actions:

–

informing Euratom safeguards inspectors on site,

–

withdrawal of the authority to operate the uranium scrap/residue recovery plant,

–

notification of the incident to the UK Department of Energy and to the Commission,

–

setting up of an inquiry team.

In appreciating both the objective and the subjective factors set out above the Commission feels that the infringements committed by UKAEA Dounreay are such that a sanction is warranted.

Given the nature of the failures established, the Commission regards it essential that all necessary action be taken to rectify the situation and to ensure that failures cannot recur in the future, all the more so since UKAEA Dounreay intends to continue to operate the uranium scrap/residue recovery plant.

In order to guarantee that the shortcomings of the measurement systems and the failures of the accounting system fo not recur, appropriate measures to improve them must be drawn up and implemented.

In view of the nature of the failures recognized and in order to guarantee that the failures do not recur, and taking into account that the operation of the uranium scrap/residue recovery plant has been suspended since immediately after the physical inventory taking in November 1991 and there is therefore no immediate danger of a recurence of the failures as long as the plant is not operating, the appropriate sanction to impose is that laid down in Article 83 (1) (a) of the Treaty.

It is necessary however, formally to require the operator to rectify the failures so that they do not recur when the plant resumes normal operation and to warn him about the possible consequences of a continued breach of the relevant provisions under Community law.