The Building (Higher-Risk Buildings Procedures) (Wales) Regulations 2025, 16

Building control authority’s power to require notifications for work to existing HRB

In forcesince 12 Dec 2025
(1)

The building control authority may, by notice in writing, require a client—

(a)

to notify the building control authority, within a specified period, when a specified point of the work to existing HRB has been reached;

(b)

not to cover up specified work for a specified period.

(2)

In this regulation, “specified” means specified by the building control authority in the notice referred to in paragraph (1).