The Building (Higher-Risk Buildings Procedures) (Wales) Regulations 2025, 13

Building control approval applications for work to existing HRB: time limit

In forcesince 12 Dec 2025
(1)

Where the building control authority receives a building control approval application for work to existing HRB which is valid, it must determine it—

(a)

within 8 weeks beginning with the date the application is received by the building control authority, or

(b)

within such longer period as at any time the building control authority and the applicant agree in writing.

(2)

A building control approval application for work to existing HRB is valid if it complies with regulation 12.