Except where stated in this Article, for the purposes of this Regulation, the definitions provided for in … Article 2 of Regulation (EU) 2019/943 of the European Parliament and of the Council of 5 June 2019 on the internal market for electricity (recast), Article 2 of Commission Regulation (EU) No 543/2013, … Article 2 of Regulation (EU) 2016/631, Article 2 of Commission Regulation (EU) 2016/1388, Article 2 of Regulation (EU) 2016/1447 … and Article 2 of Regulation (EU) 2017/1485 shall apply.
In addition, the following definitions shall apply:
‘defence service provider’ means a legal entity with a legal or contractual obligation to provide a service contributing to one or several measures of the system defence plan;
‘restoration service provider’ means a legal entity with a legal or contractual obligation to provide a service contributing to one or several measures of the restoration plan;
‘high priority significant grid user’ means the significant grid user for which special conditions apply for disconnection and re-energisation;
‘netted demand’ means the netted value of active power seen from a given point of the system, computed as (load — generation), generally expressed in kilowatts (kW) or megawatts (MW), at a given instant or averaged over any designated interval of time;
‘restoration plan’ means all technical and organisational measures necessary for the restoration of the system back to normal state;
‘re-energisation’ means reconnecting generation and load to energise the parts of the system that have been disconnected;
‘top-down re-energisation strategy’ means a strategy that requires the assistance of other TSOs to re-energise parts of the system of a TSO;
‘bottom-up re-energisation strategy’ means a strategy where part of the system of a TSO can be re-energised without the assistance from other TSOs;
‘resynchronisation’ means synchronising and connecting again two synchronised regions at the resynchronisation point;
‘frequency leader’ means the TSO appointed and responsible for managing the system frequency within a synchronised region or a synchronous area in order to restore system frequency back to the nominal frequency;
‘synchronised region’ means the fraction of a synchronous area covered by interconnected TSOs with a common system frequency and which is not synchronised with the rest of the synchronous area;
‘resynchronisation leader’ means the TSO appointed and responsible for the resynchronisation of two synchronised regions;
‘resynchronisation point’ means the device used to connect two synchronised regions, usually a circuit breaker.
“SGU” or “significant grid user” means an electricity grid user of a kind specified in Article 2(1) of Commission Regulation (EU) 2017/1485.