Commission Implementing Decision of 7 May 2012 concerning the determination of start-up…, 2

Definitions and interpretation

In forcesince 31 Dec 2020

For the purposes of this Decision the following definitions apply:

‘minimum start-up load for stable generation’ means the minimum load compatible with the steady operation of the generating combustion plant following start-up initiation after which the plant is able to safely and reliably deliver its output to a network, grid, heat accumulator or industrial site;

‘minimum shut-down load for stable generation’ means the minimum load at which point the plant can no longer safely and reliably deliver its output to a network, grid, heat accumulator or industrial site and is considered to be shutting down.

For the purpose of this Decision a reference to a provision of a Directive is to be read as a reference to that provision in so far as it has been transposed into the law of any part of the United Kingdom.

Changed on 31 Dec 2020

For the purpose of this Decision a reference to a provision of a Directive is to be read as a reference to that provision in so far as it has been transposed into the law of any part of the United Kingdom.

  1. 31 Dec 2020 – todayin force
  2. 7 May 2012 – 31 Dec 2020earlier wording