The obligation of the reservoir manager to appoint a construction engineer in respect of the relevant works terminates when the construction engineer gives a copy of the final certificate issued by the engineer in respect of the works to SEPA in accordance with section 39(9).
RA 2011, s. 41
Termination of supervision by construction engineer
In forcesince 12 Apr 2011