1.

Aid schemes for the construction, upgrade or renewal (including the replacement) of private sidings shall be compatible with the internal market within the meaning of Article 93 of the Treaty and shall be exempted from the notification requirement of Article 108(3) of the Treaty, provided that the conditions laid down in this Article and in Chapter I are fulfilled.

2.

The aid must be granted to the owner or operator of a private siding who constructs, upgrades or renews a private siding.

3.

The eligible costs shall be the investment costs in all assets directly related to the construction, upgrade and renewal of the private siding. Feasibility and topological studies, and planning and installation costs, shall also be eligible. Costs of loading/unloading platforms and equipment instrumental to the rail operations on the private siding shall also be eligible, provided that those platforms and equipment are acquired for the loading and unloading of trains on the private sidings.

4.

The aid amount must not exceed the lower of the following thresholds:

(a)

the difference between on the one hand the eligible costs and on the other hand the sum of the discounted operating profit of the investment over its economic lifetime and the discounted terminal value of that investment (residual value at the end of the economic lifetime of the investment). The discounted operating profit and terminal value shall be deducted from the eligible costs ex ante, on the basis of reasonable projections, or ex post through a claw-back mechanism. The aid amount may allow for a reasonable profit to be made. The reasonable profit shall be determined with respect to the typical profit for the sector and type of project concerned. In any event, a rate of return on capital that does not exceed the relevant swap rate plus a premium of 100 basis points shall be considered reasonable;

(b)

50 % of the eligible costs.

5.

By way of derogation from paragraph 4, for aid not exceeding EUR 2,5 million per project, aid must be granted up to a maximum aid intensity of 50 % of the eligible costs.