Art. 11 Regulation (EU) 2026/256

Rules for the reporting of fundamental data on electricity

In forcesince 30 Jan 2026
1.

The ENTSO for Electricity shall, on behalf of market participants, report information to the Agency in relation to the capacity and use of facilities for production, consumption and transmission of electricity, including planned and unplanned unavailability of those facilities, as referred to in Articles 6 to 17 of Regulation (EU) No 543/2013. The information shall be reported through the central information transparency platform as referred to in Article 3 of that Regulation.

2.

The ENTSO for Electricity shall make the information referred to in paragraph 1 available to the Agency as soon as it becomes available on the central information transparency platform.

Information referred to in Article 7(1) of Regulation (EU) No 543/2013 shall be made available to the Agency in disaggregated form, including the name and location of the consumption unit referred no later than the following working day.

Information referred to in Article 16(1), point (a), of Regulation (EU) No 543/2013 shall be made available to the Agency no later than the following working day.

3.

Electricity Transmission System Operators shall report to the Agency and, at their request, to national regulatory authorities in accordance with Article 8(5) of Regulation (EU) No 1227/2011 final nominations between bidding zones specifying the identity of market participants involved and the quantity scheduled. The information shall be made available no later than the two following working days.

4.

Electricity Transmission System Operators shall report to the Agency and, at their request, to national regulatory authorities in accordance with Article 8(5) of Regulation (EU) No 1227/2011 imbalance settlement data, indicating imbalances, final positions, allocated volumes and, where applicable, imbalance adjustments. That information shall be provided per balance responsible party and imbalance settlement period, on a monthly basis, and no later than the last day of the third month following the month in which the imbalance settlement took place.

If the information referred to in the first subparagraph is not available to the relevant Transmission System Operator, but is available to a third party in line with Article 52 of Commission Regulation (EU) 2017/2195 [Commission Regulation (EU) 2017/2195 of 23 November 2017 establishing a guideline on electricity balancing (OJ L 312, 28.11.2017, p. 6, ELI: http://data.europa.eu/eli/reg/2017/2195/oj).], that third party shall provide to the Transmission System Operator the relevant information so that the Transmission System Operator reports it to the Agency.

5.

The Agency may request additional information and clarifications from Transmission System Operators, Storage System Operators, Distribution System Operators or RRMs reporting on their behalf in relation to the data that are to be reported pursuant to this Regulation.