Art. 16 Commission Regulation (EU) No 543/2013 of 14 June 2013 on submission and publication of…

Actual generation

In forcecited 3×
1.

For their control areas, TSOs shall calculate and provide the following information to the ENTSO for Electricity:

(a)

actual generation output (MW) per market time unit and per generation unit of 100 MW or more installed generation capacity;

(b)

aggregated generation output per market time unit and per production type;

(c)

actual or estimated wind and solar power generation (MW) in each bidding zone per market time unit;

(d)

aggregated weekly average filling rate of all water reservoir and hydro storage plants (MWh) per bidding zone including the figure for the same week of the previous year.

2.

The information laid down:

(a)

in point (a) of paragraph 1 shall be published five days after the operational period;

(b)

in point (b) of paragraph 1 shall be published no later than one hour after the operational period;

(c)

in point (c) of paragraph 1 shall be published no later than one hour after the operational period and be updated on the basis of measured values as soon as they become available. The information shall be provided for all bidding zones only in Member States with more than 1 % feed-in of wind or solar power generation per year or for bidding zones with more than 5 % feed-in of wind or solar power generation per year;

(d)

in point (d) of paragraph 1 shall be published on the third working day following the week to which the information relates. The information shall be provided for all bidding zones only in Member States with more than 10 % feed-in of this type of generation per year or for bidding zones with more than 30 % feed-in of this type of generation per year.

3.

Generation units and production units located within a TSOs’ control area shall provide that TSO with all the relevant information to calculate the data laid down in paragraph 1.

Generation units and production units respectively shall be considered as primary owners of the relevant information they provide.

  • Erneuerbaren-Ausbau-Gesetz13Law

    … Dazu sind die gemäß Art. 16 der Verordnung (EU) Nr. 543/2013 über die Übermittlung und die Veröffentlichung von Daten in Strommärkten, ABl. Nr. L 163 vom 15.06.2013 S. 1, zuletzt geändert durch die Verordnung (EU) 2019/943, ABl. Nr. …

  • Regulation (EU) 2026/25611Law

    … на посочената потребяваща единица. Информацията, посочена в член 16, параграф 1, буква а) от Регламент (ЕС) № 543/2013, се предоставя на …

  • Commission Implementing Regulation (EU) No 1348/2014 of 17 December 2014 on data reporti…8Law

    … name and location of the consumption unit referred no later than the following working day. Information referred to in Article 16(1)(a) of Regulation (EU) No 543/2013 shall be made available to the national regulatory authority no later …