23 REASONS FOR INITIATING A DETAILED EXAMINATION, Decision_act (EU) 2026/865

In forcesince 27 Mar 2026

The PRB has calculated the estimated differences between the determined costs for RP4 set by the Netherlands in the revised draft FABEC performance plan and the determined costs that would be required to meet the Union-wide DUC trend for RP4 and the long-term Union-wide DUC trend for RP3 and RP4 combined. Based on the PRB findings, the total determined costs for RP4 proposed by the Netherlands fall short by approximately EUR 77,1 M in EUR2022 of the level required to meet the Union-wide DUC trend, which represents an average annual gap of EUR 15,4 M in EUR 2022. A more significant difference amounting over the whole RP4 to approximately EUR 370 M in EUR2022 is observed against the level required to meet the long-term Union-wide DUC trend, which corresponds to an annual average gap of approximately EUR 74 M in EUR 2022.