Recital 38, Regulation (EU) 2025/1176

In forcesince 23 May 2025

Where the bidding project’s contribution to electricity system needs from a locational perspective is assessed, the focus should be on the interaction between grid topology and the location of generation and consumption assets, which can lead to grid congestion issues and lower use of renewable energy. An optimal location of new renewable energy generation projects and of the grid connection point can therefore help alleviate grid congestion issues and is of crucial importance for electricity system needs. Auctions can therefore limit participation to projects located in predefined areas where they can help reduce grid congestion or attribute points to bidding projects on the basis of their locational impact.