When including energy system integration as a criterion in their auction design, the relevant authorities should take into account the contribution of bidding projects to addressing system needs, based on the following three key parameters: the contribution of bidding projects to electricity system needs from a temporal perspective; their contribution to establishing connections across energy carriers; and their contribution to electricity system needs from a locational perspective.
Recital 35, Regulation (EU) 2025/1176
In forcesince 23 May 2025