Recital 43, Regulation (EU) 2024/1735

In forcesince 13 Jun 2024

By defining CO2 storage sites and any related CO2 capture and CO2 infrastructure projects that contribute to the Union’s 2030 target as net-zero strategic projects, the development of CO2 storage sites can be accelerated and facilitated, and the increasing industrial demand for storage sites can be channelled towards the most-cost-effective storage sites. An increasing volume of depleting gas and oil fields that could be converted into safe CO2 storage sites are at the end of their useful production lifetime. In addition, the oil and gas industry has affirmed its determination to embark on an energy transition and possesses the assets, skills and knowledge needed to explore and develop additional storage sites. To reach the Union’s target of 50 million tonnes of annual operational CO2 injection capacity by 2030, the sector needs to pool its contributions to ensure that CCS as a climate solution is available ahead of demand. In order to ensure a timely, Union-wide and cost-effective development of CO2 storage sites in line with the Union objective for injection capacity, licensees of oil and gas production in the Union should contribute to that target on a pro rata basis of their oil and gas manufacturing capacity, while providing flexibilities to cooperate and take into account other contributions of third parties. A value-chain approach should be fostered by actions taken both at Union and national level. Accordingly, licensees of oil and gas production in the Union should undertake the necessary investments and support the development of viable business models for the entire carbon dioxide value chain.