Net-zero technology manufacturing projects undergo lengthy and complex permit-granting processes which can last between two and seven years, depending on the Member State technology and value chain segment. Considering the size of the required investments, in particular for gigafactory-size projects which are needed to reach the expected economies of scale, inadequate permit-granting processes create an additional and often detrimental barrier to increasing net-zero technology manufacturing capacity in the Union. In order to provide project promoters and other investors with the security and clarity needed to increase development of net-zero technology manufacturing projects, Member States should ensure that the permit-granting process related to such projects does not exceed pre-set time limits. For net-zero strategic projects, the length of the permit-granting process should not exceed 12 months for facilities with a yearly production output of 1 GW or more, nine months for those with a yearly production output of less than 1 GW, or 18 months for all necessary permits to operate a strategic CO2 storage site and the deployment of related CO2 capture and CO2 transport projects. For net-zero technology manufacturing projects, the length of the permit-granting process should not exceed 18 months for facilities with a yearly production output of 1 GW or more, and 12 months for those with a yearly production output of less than 1 GW. For net-zero technologies for which the GW metric is not relevant, such as grids and carbon capture and storage (CCS) or CO2 transport and utilisation technologies, the upper limits of the those deadlines should apply. However, the first step of the environmental impact assessment pursuant to Directive 2011/92/EU, which consists of the preparation of an environmental impact assessment report, is often predominantly performed by the project promoter. That step should therefore not be integrated in the timelines which the Member States are bound by as referred to in the permit-granting process. To that end, the single point of contact should notify the date by which the project promoter needs to submit the environmental impact assessment report, and any period between that notified date and the actual submission of the report should not be counted towards the timeline. The same principle should apply where, after the required consultations, the single point of contact notifies the project promoter of the opportunity to submit additional information to complete the environmental impact assessment report. In exceptional cases related to the nature, complexity, location or size of the proposed project, Member States should be able to extend the timelines. Such exceptional cases could include unforeseen circumstances triggering the need to add to or complete environmental assessments related to the project, or delays due to expropriation processes where required.
Recital 25, Regulation (EU) 2024/1735
In forcesince 13 Jun 2024