The new geopolitical context arising from Russia’s war of aggression against Ukraine showed how important seamless transport connections are within the Union’s territory and with neighbouring countries. A railway track gauge different from that of the European standard nominal track gauge of 1435 mm severely hampers the interoperability of the railway networks across the Union and even impacts the competitiveness of those isolated railway networks. New railway lines of the core network or extended core network should therefore be built in European standard nominal track gauge of 1435 mm. In addition, Member States with a network with a track gauge different from that of the European standard nominal track gauge of 1435 mm should assess the migration of existing lines of the European Transport Corridors to the European standard nominal track gauge of 1435 mm. This obligation should not apply to island and outermost regions, as, due to their geographical situation, their network is fully detached from any land-side connection on the Union territory.
Recital 45, Regulation (EU) 2024/1679
In forcesince 13 Jun 2024