Recital 33, Regulation (EU) 2024/1679

In forcesince 13 Jun 2024

Originally, under Regulation (EU) No 913/2010, Member States having a rail network with a track gauge different from that of the main rail network within the Union were not obliged to participate in the establishment of freight corridors or the prolongation of existing corridors under that Regulation. Such Member States should be allowed, for a maximum temporary period of 10 years, to decide that the infrastructure manager(s) responsible for the railway infrastructure on their territory do not participate in the management board of the freight corridors on their territory.