Art. 20 Regulation (EU) 2024/1679

Additional priorities for railway infrastructure development

In forcesince 13 Jun 2024

In the promotion of projects of common interest related to railway infrastructure, and in addition to the general priorities set out in Articles 12 and 13, attention shall be given to the following:

(a)

migrating to the European standard nominal track gauge of 1435 mm, where relevant;

(b)

mitigating the impact of noise and vibration caused by rail transport, in particular through measures for rolling stock and for infrastructure, including noise protection barriers;

(c)

improving the safety of level crossings;

(d)

where appropriate, connecting railway transport infrastructure with inland waterway port infrastructure;

(e)

subject to socio-economic costs and benefits analysis, developing infrastructure for train lengths above 740 m and up to 1500 m and 25,0 tonnes axle load when constructing and modernising railway lines relevant for freight traffic;

(f)

developing and deploying innovative technologies for railways, building in particular on the work of the Shift2Rail and Europe’s Rail Joint Undertakings, notably automatic train operation, advanced traffic management, and digital connectivity for passengers based on ERTMS and digital automatic couplings, connectivity based on 5G and satellite and inertial units for the geopositioning units of ERTMS;

(g)

when building or upgrading railway infrastructure, ensure the continuity and accessibility of pedestrian and cycling paths, and develop bicycle parking in the vicinity of the stations in order to promote the active modes of transport;

(h)

developing innovative alternative fuels technologies for railways, such as hydrogen or battery powered trains for sections and rail access routes that are exempted from the electrification requirement;

(i)

for the development of the trans-European transport network, providing a standard of ensuring the circulation of freight trains carrying standard semi-trailers up to 4 m high loaded at a height of 33 cm, without any additional requirement for special permission to operate services; and

(j)

upgrading to double-track rail in bottlenecks sections suffering from capacity barriers.