Art. 19 Regulation (EU) 2024/1679

Operational priorities

In forcesince 13 Jun 2024cited 2×
1.

The Rail Freight governance shall make all possible efforts to ensure by 31 December 2030, that, on the European Transport Corridors, the quality of services provided to railway undertakings and technical and operational requirements for infrastructure use do not prevent the operational performance of rail freight services along the European Transport Corridors from meeting the following target values:

(a)

for each internal cross-border section, the dwelling time of all freight trains crossing the border between two Member States does not exceed 25 minutes on average, except at the sections where a change of track gauge takes place or where the checks carried out at a border where the controls have not yet been lifted on trains in application of point 1.2 of Annex VI to Regulation (EU) 2016/399 do not allow for this time-limit to be complied with; the dwelling time of a train on a cross-border section means the total additional transit time that can be attributed to the existence of the border crossing, irrespective of procedures or considerations of infrastructural, operational, technical and administrative nature; dwelling time does not include the time that cannot be attributed to the border crossing, such as operational procedures carried out in facilities located in the proximity of the border crossing but not intrinsically related to it; and

(b)

at least 75 % of the freight trains crossing at least one border along a European Transport Corridor arrive at their destination, or at the external Union border if their destination is outside the Union, at their scheduled time or with a delay of less than 30 minutes by reasons that are attributable to the infrastructure manager(s) of the Union; delays occurring in and attributable to third countries that are crossed by freight trains shall not be taken into account.

2.

Member States shall make all possible efforts to ensure that, by 31 December 2030 for the lines for freight transport on the core network, by 31 December 2040 for the lines for freight transport on the extended core network, and by 31 December 2050 for the lines for freight transport of the comprehensive network referred to in Article 15(3), the following conditions apply:

(a)

on double track lines, at least two train paths per hour and direction can be allocated to freight trains with a length of at least 740 m (including the locomotive or locomotives); and

(b)

on single track lines, at least one train path per two hours and direction can be allocated to freight trains with a length of at least 740 m (including the locomotive or locomotives).