Recital 4, Regulation (EU) 2023/1184

In forcesince 10 Feb 2023

The nascent nature of the hydrogen industry, its value chain and the market means that planning and construction of installations generating renewable electricity as well as installations producing renewable liquid and gaseous transport fuel of non-biological origin are often subject to significant delays in the permitting processes and other unexpected hurdles, despite being scheduled to enter into operation at the same time. It is therefore appropriate for the reason of practical feasibility to consider a time period of up to 36 months when determining if an installation generating renewable electricity has come into operation after, or at the same time as, the installation producing renewable liquid and gaseous transport fuel of non-biological origin. Sourcing renewable electricity for the production of renewable liquid and gaseous transport fuels of non-biological origin via a direct connection from an installation producing renewable electricity that is not connected to the grid demonstrates that the electricity is produced in this installation. However, if the installation producing renewable electricity and the installation producing hydrogen are not only directly connected but are also connected to the grid, evidence should be provided that the electricity used to produce hydrogen is supplied through the direct connection. The installation supplying electricity for hydrogen production through a direct connection should always supply renewable electricity. If it supplies non-renewable electricity, the resulting hydrogen should not be considered renewable.