For the purposes of this Regulation, the following definitions apply:
‘bidding zone’ means bidding zone as defined in Article 2, point (65), of Regulation (EU) 2019/943 of the European Parliament and of the Council [Regulation (EU) 2019/943 of the European Parliament and of the Council of 5 June 2019 on the internal market for electricity (OJ L 158, 14.6.2019, p. 54).] for Member States, or an equivalent concept for third countries;
‘direct line’ means direct line as defined in Article 2, point (41), of Directive (EU) 2019/944 of the European Parliament and of the Council [Directive (EU) 2019/944 of the European Parliament and of the Council of 5 June 2019 on common rules for the internal market for electricity and amending Directive 2012/27/EU (OJ L 158, 14.6.2019, p. 125).];
‘installation generating renewable electricity’ means individual units, or groups of units, producing electricity in one or several locations from the same or from different renewable sources, as defined in Article 2, point (1) of Directive (EU) 2018/2001, excluding units producing electricity from biomass and storage units;
‘fuel producer’ means an economic operator that produces renewable fuel of non-biological origin;
‘come into operation’ means starting production of renewable fuels of non-biological origin or renewable electricity for the first time or following a repowering as defined under Article 2, point (10) of Directive (EU) 2018/2001 requiring investments exceeding 30 % of the investment that would be needed to build a similar new installation;
‘smart metering system’ means smart metering system as defined in Article 2, point (23) of Directive (EU) 2019/944;
‘imbalance settlement period’ means imbalance settlement period as defined in Article 2, point (15) of Regulation (EU) 2019/943 within the Union, or an equivalent concept for third countries.