Energy infrastructure needs to be in place to support the significant scaling up of renewable energy generation. Member States should be able to designate dedicated infrastructure areas where the deployment of grid or storage projects that are necessary to integrate renewable energy into the electricity system is not expected to have a significant environmental impact, such an impact can be duly mitigated or, where not possible, compensated for. Infrastructure projects in such areas may benefit from more streamlined environmental assessments. If Member States decide not to designate such areas, the assessments and rules applicable under Union environmental law remain applicable. In order to designate infrastructure areas, Member States should prepare one or more plans, including by means of national legislation, encompassing the identification of the areas and the applicable rules and mitigation measures for projects located in each infrastructure area. The plans should clearly indicate the scope of the dedicated area and the type of infrastructure projects covered. Each plan should be subject to an environmental assessment pursuant to Directive 2001/42/EC in order to assess the impact of each type of project on the relevant designated areas. Grids projects in such dedicated infrastructure areas should avoid to the extent possible Natura 2000 sites and areas designated under national protection schemes for nature and biodiversity conservation, unless, due to the specificities of grid projects, there are no proportionate alternatives for the deployment of such projects. When assessing proportionality, Member States should take into account the need to ensure the economic viability, the feasibility and the effective and accelerated implementation of the project with a view to ensuring that the additional generation capacity of renewable energy deployed can be promptly integrated into the energy system, or whether infrastructure projects of various types already exist in the specific Natura 2000 site or protected area, which would allow to bundle different infrastructure projects in a site resulting in lower environmental impact.

Dedicated plans for storage projects should always exclude Natura 2000 sites since there are less constraints on where to place them. In such areas, Member States should, under justified circumstances including where needed to accelerate the grid expansion to support the deployment of renewable energy to achieve the climate and renewable energy targets, be able to introduce exemptions from certain assessment obligations provided for in Union environmental law under certain conditions. If Member States decide to make use of such exemptions, the specific projects should be subject to a streamlined screening process similar to the screening process provided for renewables acceleration areas, which should be based on existing data. Requests of the competent authority to provide additional available information should not require a new assessment or data collection. If such a screening process identifies projects that are highly likely to give rise to significant unforeseen adverse effects, the competent authority should ensure that appropriate and proportionate mitigation measures, or if not available, compensatory measures, are applied. In the case of compensatory measures, the project development can be pursued while compensatory measures are being identified.