The installation of solar energy equipment and related co-located energy storage, as well as the connection of such equipment and storage to the grid, in existing or future artificial structures created for purposes other than solar energy production or energy storage with the exclusion of artificial water surfaces, such as rooftops, parking areas, roads and railways, do not typically raise concerns related to competing uses of space or environmental impact. It should therefore be possible for those installations to benefit from shorter permit-granting procedures and be exempt from the obligation to carry out an environmental impact assessment pursuant to Directive 2011/92/EU, while allowing Member States to take into account specific circumstances relating to the protection of cultural or historical heritage, national defence interests, or safety reasons. Self-consumption installations, including those for collective self-consumers, such as local energy communities, also contribute to reducing overall demand for natural gas, to increasing resilience of the system and to achieving the Union’s renewable energy targets. The installation of solar energy equipment with a capacity below 100 kW, including installations of renewables self-consumers, is not likely to have significant adverse effects on the environment or the grid and does not raise safety concerns. In addition, small installations do not generally require capacity expansion at the grid-connection point. In view of the immediate positive effects of such installations for consumers and the limited environmental impact they may give rise to, it is appropriate to further streamline the permit-granting procedure applicable to them, provided that they do not exceed the existing capacity of the connection to the distribution grid, by introducing the concept of administrative positive silence in the relevant permit-granting procedures in order to promote and accelerate the deployment of those installations and to be able to reap their benefits in the short term. Member States should be allowed to apply a threshold lower than 100 kW on the basis of their internal constraints, provided that the threshold remains higher than 10,8 kW.
Recital 42, Directive (EU) 2023/2413
In forcesince 18 Oct 2023
- num:eu=2011/92 (several documents carry this name)