128 5. ASSESSMENT OF THE AID › 5.1. Existence of aid within the meaning of Article 107(1) TFEU › 5.1.4. Advantage › 5.1.4.1. Separability of the 2019 loan from the 2017 loans and applicability of the MEO test, Decision_act (EU) 2023/2160

In forcesince 27 Mar 2023

In their submission to the Commission before the Opening Decision, the Italian authorities claimed that the 2019 loan was an additional instalment (see recital 104) and therefore an extension of the 2017 loans. The Italian authorities reiterated that position in their submissions after the Opening Decision (see recital 106), adding that the aim of the 2019 loan was the same as the aim of the 2017 loans, i.e. to avoid interruption of the service provided by Alitalia and disruption in the Italian air transport. Thus, the Italian authorities argued that the 2019 loan should be examined in the ambit of the investigation in Case SA.48171, in which the Commission found that the 2017 loans were incompatible with the internal market.