Recital 3, Decision_act (EU) 2022/2277

In forcesince 15 Nov 2022

As an alternative measure, the project foresees to create an access to a safe area through a vertical emergency exit to the surface after 3,895 km of the entrance of the Miglionico tunnel, with the purpose of evacuating passengers and allowing access for rescue vehicles. The proposed measure corresponds to the requirement set under the Italian Ministerial Decree of 28 October 2005 ‘safety in railway tunnel’ [The Italian Ministerial Decree of 28 October 2005 ‘safety in railway tunnel’ is under review following a negative assessment carried out in accordance with the procedure set out in Article 26 of Regulation (EU) 2016/796 of the European Parliament and of the Council of 11 May 2016 on the European Union Agency for Railways and repealing Regulation (EC) No 881/2004 (OJ L 138, 26.5.2016, p. 1).], which provides for the construction of an emergency exit approximately every 4 km for tunnels above 5 km. A specific and detailed risk analysis was carried out by the Italian infrastructure manager in accordance with Commission Implementing Regulation (EU) No 402/2013 [Commission Implementing Regulation (EU) No 402/2013 of 30 April 2013 on the common safety method for risk evaluation and assessment and repealing Regulation (EC) No 352/2009 (OJ L 121, 3.5.2013, p. 8).], demonstrating that in this case all identified risks are below the level of unacceptability, and therefore concluding that the safety of the tunnel is considered acceptable and that with the mitigating measure in place, the non-application of point 4.2.1.5.2, (b)(1) of the Annex to Regulation (EU) No 1303/2014 would not compromise the safety of the tunnel.