Recital 2, Decision_act (EU) 2022/2277

In forcesince 15 Nov 2022

The tunnel, single track, is 6,6 km long and already exists. The construction works on the Ferrandina – Matera La Martella line were partially carried out, but not completed, between 1984 and 2000 based on national standards. The line never entered into service as construction works were not finalised because of lack of funds. The tender procedure for the finalisation, upgrade and opening of the Ferrandina – Matera La Martella line, after having suffered significant delays, has been launched and it is planned to be finalised by the end of 2022 (‘the project’). The finalisation, upgrade and opening of the Miglionico tunnel foresees to implement all relevant provisions of the technical specification for interoperability (TSI) set out in Regulation (EU) No 1303/2014, except for point 4.2.1.5.2, (b)(1) of its Annex which requires side and/or vertical emergency exits to the surface to be provided at least every 1000 metres; the alternative point 4.2.1.5.2, (b)(2) cannot apply because it is a single tube tunnel.