1. FACTS › 1.1. THE REQUEST, Decision_act (EU) 2022/1376

In forcesince 26 Jul 2022
(3)

However, the request does not cover the following:

electricity produced by onshore and offshore wind turbines outside tenders;

electricity produced by wind turbines connected to a grid from 21 February 2008 to 31 December 2013 or later, except for wind turbines which are connected to their own consumption installation and offshore wind turbines (electricity produced from consumption installation (§ 41 of the Promotion of the Renewable Energy Act) and offshore wind turbines pursuant to § 35 b of that Act are excluded from the application and are consequently still to be subject to the provisions of Directive 2014/25/EU);

electricity produced by wind turbines connected to a grid no later than 20 February 2008, except for wind turbines which receive price supplements pursuant to sections 39-41 of the Promotion of the Renewable Energy Act;

electricity produced by wind turbines connected to a grid no later than 31 December 2002;

electricity produced by a brand new wind turbine utilising scrapping certificates issued for the dismantling of wind turbines (additional price supplement); electricity produced by bioenergy (biomass and biogas);

electricity produced by solar photovoltaic panels, waves and hydropower;

electricity produced by other special renewable energy installations (electricity produced from renewable energy sources or technologies of significance for the future expansion of renewable electricity or electricity produced from other renewable energy sources than the ones mentioned);

electricity produced by decentralised heat and power plants and incineration plants;

electricity produced from other heat and power plants intended to supply district heating;

electricity produced from industrial power plants connected to a grid no later than 21 March 2012;

ancillary services.